// applications · regulation → gas → solution

Where the law says
“measure”.

Seven EU rules now demand a measured, verifiable gas number instead of an estimate. Each page: key dates, what the text requires (with article numbers), what you have to measure, and the Tremon NDIR channel, instrument or system we build on for it.

ShareLinkedInEmailWhatsAppX
Pick your rule
F-gas Regulation
SF₆ switchgear: bans, leak checks, monitoring exemption
Installed SF₆ switchgear stays in service for decades. Regulation (EU) 2024/573 keeps it legal only if you can show the gas stays inside — a density monitor with automatic alert replaces periodic leak checks.
→ DM-91, IR·SF₆, GDC-S52
Methane Regulation
LDAR surveys, repair deadlines, measurement & reporting
Methane leaks are no longer an estimate. Regulation (EU) 2024/1787 fixes survey frequencies, detection thresholds and repair deadlines — and requires source- and site-level measurement in the reports.
→ TRM-EX, IR·OEM, TRM-PGA
Industrial Emissions Directive
Permits, BAT-AELs, continuous emission monitoring (EN 14181)
The revised IED tightens permits to the stricter end of BAT-AEL ranges and asks for environmental management systems. The permit says what to measure, how often, and with what quality assurance — usually EN 14181.
→ TRM-PGA, IR·OEM, GDC
CBAM
Carbon border adjustment: actual, verified emissions instead of defaults
From 2026 the CBAM price is paid on embedded emissions. Default values are expensive; measured, verified emissions are the lever — and measurement-based monitoring means continuous CO₂ measurement in the flue gas.
→ TRM-PGA, IR·OEM, GDC
EPBD recast
Indoor air quality monitoring in non-residential buildings
The recast EPBD makes indoor air quality a building requirement: zero-emission non-residential buildings must have measuring and control devices for IAQ, and major renovations must add them where feasible. CO₂ is the reference parameter.
→ IR·OEM
Workplace: exposure limits
Toxic and combustible gas detection at the workplace
Two families of rules: exposure limits protect people from toxic gases; ATEX protects the plant from explosions. Both end in a detector with an alarm — and in the record that it was calibrated.
→ TRM-EX, GDC, IR·OEM
Biomethane: REPowerEU target & EN 16723 gas quality
Digester control and grid-injection quality
REPowerEU set a 35 bcm/year biomethane ambition for 2030. Every injected cubic metre is measured twice: for the digester and for the grid contract — CH₄ and CO₂ by NDIR, O₂, H₂S and water by other channels.
→ TRM-PGA, IR·OEM, GDC
At a glance
RuleNext dateGasesTremon
F-gas Regulation1 Jan 2026: No putting into operation of new MV switchgear ≤ 24 kV with F-gases (Art. 13(9)(a))SF₆ · C₄F₇N · CF₄DM-91, IR·SF₆, GDC-S52
Methane Regulation5 May 2025: LDAR programme submitted to the competent authority for existing sites (Art. 14(1))CH₄ · CO₂TRM-EX, IR·OEM, TRM-PGA
Industrial Emissions Directive1 Jul 2026: Transposition deadline for Member States (Art. 4(1))CO₂ · CO · SO₂ · N₂O · NH₃TRM-PGA, IR·OEM, GDC
CBAM31 Dec 2024: Authorisation of declarants opens (Art. 5, 10, 14, 16, 17)CO₂ · N₂O · CF₄TRM-PGA, IR·OEM, GDC
EPBD recast29 May 2026: Transposition deadline for most articles (Art. 35(1))CO₂IR·OEM
Workplace: exposure limits20 May 2021: Directive 2019/1831 transposed (5th IOELV list)CO · NH₃ · SO₂ · SO₂F₂ · CH₃Br · CH₄ · C₃H₈ · CO₂TRM-EX, GDC, IR·OEM
Biomethane: REPowerEU target & EN 16723 gas quality2016: EN 16723-1 specification for biomethane injected into natural-gas networksCH₄ · CO₂TRM-PGA, IR·OEM, GDC
Start a project

Tell us what you measure — just tap

Three taps and an email. An engineer replies within 24 h with a feasibility read and a proposed next step.

1 · Which gas?
2 · What for?
3 · What form?
4 · Where do we reply?
Goes to [email protected]. No newsletter — your message goes straight to an engineer.
Start a project →