Pick your rule
F-gas Regulation
SF₆ switchgear: bans, leak checks, monitoring exemption
Installed SF₆ switchgear stays in service for decades. Regulation (EU) 2024/573 keeps it legal only if you can show the gas stays inside — a density monitor with automatic alert replaces periodic leak checks.
→ DM-91, IR·SF₆, GDC-S52
Methane Regulation
LDAR surveys, repair deadlines, measurement & reporting
Methane leaks are no longer an estimate. Regulation (EU) 2024/1787 fixes survey frequencies, detection thresholds and repair deadlines — and requires source- and site-level measurement in the reports.
→ TRM-EX, IR·OEM, TRM-PGA
Industrial Emissions Directive
Permits, BAT-AELs, continuous emission monitoring (EN 14181)
The revised IED tightens permits to the stricter end of BAT-AEL ranges and asks for environmental management systems. The permit says what to measure, how often, and with what quality assurance — usually EN 14181.
→ TRM-PGA, IR·OEM, GDC
CBAM
Carbon border adjustment: actual, verified emissions instead of defaults
From 2026 the CBAM price is paid on embedded emissions. Default values are expensive; measured, verified emissions are the lever — and measurement-based monitoring means continuous CO₂ measurement in the flue gas.
→ TRM-PGA, IR·OEM, GDC
EPBD recast
Indoor air quality monitoring in non-residential buildings
The recast EPBD makes indoor air quality a building requirement: zero-emission non-residential buildings must have measuring and control devices for IAQ, and major renovations must add them where feasible. CO₂ is the reference parameter.
→ IR·OEM
Workplace: exposure limits
Toxic and combustible gas detection at the workplace
Two families of rules: exposure limits protect people from toxic gases; ATEX protects the plant from explosions. Both end in a detector with an alarm — and in the record that it was calibrated.
→ TRM-EX, GDC, IR·OEM
Biomethane: REPowerEU target & EN 16723 gas quality
Digester control and grid-injection quality
REPowerEU set a 35 bcm/year biomethane ambition for 2030. Every injected cubic metre is measured twice: for the digester and for the grid contract — CH₄ and CO₂ by NDIR, O₂, H₂S and water by other channels.
→ TRM-PGA, IR·OEM, GDC
At a glance
| Rule | Next date | Gases | Tremon |
|---|---|---|---|
| F-gas Regulation | 1 Jan 2026: No putting into operation of new MV switchgear ≤ 24 kV with F-gases (Art. 13(9)(a)) | SF₆ · C₄F₇N · CF₄ | DM-91, IR·SF₆, GDC-S52 |
| Methane Regulation | 5 May 2025: LDAR programme submitted to the competent authority for existing sites (Art. 14(1)) | CH₄ · CO₂ | TRM-EX, IR·OEM, TRM-PGA |
| Industrial Emissions Directive | 1 Jul 2026: Transposition deadline for Member States (Art. 4(1)) | CO₂ · CO · SO₂ · N₂O · NH₃ | TRM-PGA, IR·OEM, GDC |
| CBAM | 31 Dec 2024: Authorisation of declarants opens (Art. 5, 10, 14, 16, 17) | CO₂ · N₂O · CF₄ | TRM-PGA, IR·OEM, GDC |
| EPBD recast | 29 May 2026: Transposition deadline for most articles (Art. 35(1)) | CO₂ | IR·OEM |
| Workplace: exposure limits | 20 May 2021: Directive 2019/1831 transposed (5th IOELV list) | CO · NH₃ · SO₂ · SO₂F₂ · CH₃Br · CH₄ · C₃H₈ · CO₂ | TRM-EX, GDC, IR·OEM |
| Biomethane: REPowerEU target & EN 16723 gas quality | 2016: EN 16723-1 specification for biomethane injected into natural-gas networks | CH₄ · CO₂ | TRM-PGA, IR·OEM, GDC |
Start a project
Tell us what you measure — just tap
Three taps and an email. An engineer replies within 24 h with a feasibility read and a proposed next step.